This report presents a cost-benefit analysis of four adaptation scenarios ranging from ecosystem-based to engineering-based. The report argues that the highest benefit-cost ratio is for ecosystem-based options, with FJ$19.50 benefit for every dollar spent.
THEMES:
TAGS:
- Ecosystem